If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

飞速加速器官网网址-outline

飞速加速器官网网址-outline

免费服务器节点安卓下载,免费服务器节点mac下载,免费服务器节点vnp,免费服务器节点跑路了  v2rayng怎么用官方网址,v2rayng怎么用ios下载,v2rayng怎么用电脑版下载,v2rayng怎么用vps  西柚加速器下载地址,西柚加速器mac下载,西柚加速器vqn,西柚加速器免费永久加速  梯子外网加速器官网网址,梯子外网加速器npv,梯子外网加速器用不了了,梯子外网加速器打不开了  飞刀加速器mac下载,飞刀加速器vnp,飞刀加速器打不开,飞刀加速器2024年  456加速器ios下载,456加速器vqn,456加速器vnp,456加速器打不开  原子加速器官网,原子加速器官方网址,原子加速器永久免费加速,原子加速器不能用了